quotation:[Copy]
Jun LIU,Ping LI,Zhihuan SONG.[en_title][J].Control Theory and Technology,2004,2(4):345~352.[Copy]
【Print page】 【Online reading】【Download 【PDF Full text】 View/Add CommentDownload reader Close

←Previous page|Page Next →

Back Issue    Advanced search

This Paper:Browse 827   Download 66 本文二维码信息
码上扫一扫!
JunLIU,PingLI,ZhihuanSONG
0
()
摘要:
关键词:  
DOI:
Received:December 15, 2003
基金项目:
Scheduling and control of failure prone systems with demand uncertainty and job overlaps
Jun LIU, Ping LI, Zhihuan SONG
(Institute of Industrial Process Control, Zhejiang University, Hangzhou Zhejiang 310027, China) School of Mechanical & Electonical Engineering, Lanzhou University of Technology, Lanzhou Gansu 730050, China)
Abstract:
Given that the overkpping of jobs is permitted, the paper studies the scheduling and control of failure prone pro-duction systems, i.e. so-called settings with demand uncertainty and job overlaps. Because a variable demand resource is involved in the production and corrective maintenance control problems of the system, which switched randomly between zero and a maximum level, it is difficult to obtain the analytical solutions of the optimal single hedging point policy. An asymptotic optimal scheduling policy is presented and a double hedging point policy is offered to control simultaneously the production rate and the corrective maintenance rate of the system. The corresponding analytical solutions and approximate solutions are obtained. Considering the rela-tionship of production, corrective maintenance and demand variable, an approximate optimal single hedging point control policy is proposed. Numerical results are presented.
Key words:  Overlap  Hybrid system  Markov processes  Optimal hedging point policy  Production control  Corrective maintenance.